5025 - Thunder Horse PLET Re-installation Project - PipeLOK
nrthamica_15
Client: BP America Production Company
Location: Mississipi Canyon – Block 778
Region: Gulf of Mexico
Description:
Thunder Horse PLET Restoration
Scope of Supply:

4 off 12” Pipeline Recovery Tools (600T SWL).
5 off 10” Pipeline Recovery Tools (415T SWL).
7 off 8” Pipeline Recovery Tools – Various Wall Thickness's (350T SWL).
29 Pipeline Preservation Plugs with Chemical Injection Facility.
8 Pipeline Hold-back Plugs with Chemical Injection Facilities and 250mT Hold-back Capacity.
Additional info: 21 Pipeline lifts in deep water. Hyperbaric testing of tools. Extended load testing of each size of recovery tool. Tools were designed to accommodate a 5% side load as well as rated axial load. All lifting tools subject independent design Approved by DNV.